2020 |
SUPPLY AND INSTALLATION OF WATER CONNECTION WORK IN WEST DIVISION FOR ZONE W1 – 2020 TO 2023 |
PUB |
$2,100,000 |
2020 |
SUPPLY AND INSTALLATION OF WATER CONNECTION WORK IN EAST DIVISION FOR ZONE E2 – 2020 TO 2023 |
PUB |
$2,100,000 |
2019 |
REPLACEMENT OF WATER MAINS FOR NETWORK RENEWAL DIVISION FOR YEAR 2019 TO 2022 PACKAGE 3 |
PUB / SING & SAN |
$20,000,000 |
2019 |
REPLACEMENT OF WATER MAINS FOR NETWORK RENEWAL DIVISION FOR YEAR 2019 TO 2022 PACKAGE 3 |
PUB / SHENG KEONG |
$20,000,000 |
2019 |
WATER MAINS REPAIR AND OTHER CONTRACT WORK FOR NETWORK SERVICE (WEST) DIVISION |
PUB |
$7,500,000 |
2019 |
DIVERSION OF 300MM WATER PIPE FOR BEDOK TOWN CENTE CONTRACT 8 |
CHIU TENG CONSTRUCTION CO PTE LTD |
$350,000 |
2019 |
DIVERSION OF 300MM WATER PIPE FOR PARC ESTA DEVELOPMENT AT SIMS AVENUE |
CHINA CONSTRUCTION PTE LTD |
$300,000 |
2019 |
DIVERSION OF 200MM WATER PIPE TO SERVE AS SECOND FEED AT HOUGANG AVENUE TO FOT FLORENCE RESIDENCE |
TIONG AIK CONSTRUCTION PTE LTD |
$350,000 |
2019 |
DIVERSION OF 300MM WATER PIPE AT TAMPINES ST 62 |
QINGJIAN INTERNATIONAL (SOUTH PACIFIC) |
$150,000 |
2019 |
DIVERSION OF 150MM WATER PIPE AND INSTALLATION OF INSERTION VALVE AT ROWELL COURT UPGRADING PROJECT |
HON INDUSTRY PTE LTD |
$350,000 |
2019 |
DIVERSION OF 150MM WATER PIPE AND INSTALLATION OF INSERTION VALVE AT BLK 1 BEDOK RESERVOIR ROAD |
KHIAN HENG CONSTRUCTION |
$100,000 |
2018 |
REPLACEMENT OF WATER MAINS FOR NETWORK RENEWAL DIVISION FOR YEAR 2017 TO 2020 PACKAGE 1A |
SING & SAN / PUB |
$2,000,000 |
2018 |
LAYING OF DN800MM POTABLE WATER PIPE ALONG CHANGI COAST ROAD AND AVIATION PARK ROAD (CHANGI EAST DEVELOPMENT) |
HUATIONG / CAG |
$3,000,000 |
2018 |
LAYING OF DN300MM AND DN500MM POTABLE WATER AND NEWATER PIPE AT CHANGI EAST DEVELOPMENT |
HUATIONG / CAG |
$1,5000,000 |
2018 |
DIVERSION OF 800MM POTABLE WATER PIPE AT SELARANG PARK COMPLEX |
TIONG SENG CONTRATOR / SPC |
$350,000 |
2018 |
REPLACEMENT OF DAMAGED DN 700MM POTABLE WATER PIPE AT IRWELL BANK ROAD |
TIONG SENG / PUB |
$100,000 |
2018 |
DIVERSION OF 200MM WATER PIPE AT G22F PRECINT C EUNOS ROAD 5 |
LBD ENGINEERING PTE LTD / HDB |
$130,000 |
2018 |
WATER PIPE DIVERSION AT BLK 332 UBI AVENUE 1 |
LBD ENGINEERING PTE LTD / HDB |
$136,000 |
2017 |
LAYING OF DN300MM AND DN 700MM POTABLE WATER PIPE AT SENGKANG WEST ROAD AND SENGKANG WEST AVENUE |
SAM LIAN / HDB |
$2,000,000 |
2017 |
SUPPLY AND LAYING OF WATER MAINS (EAST ) DIVISION FOR YEAR 2017-2021 ZONE E2 |
PUB |
$5,000,000 |
Honghock Global Pte Ltd
1, Yishun Street 23 YS-ONE
#03-30
Singapore 768441
Telephone: +65 6481 5414Fax: 6481 5472
enquiries@honghockglobal.com.sg
Copyright 2021 @ Honghock global pte ltd. design by: quantum